Sewage Issue At Back Of Neighborhood - Feb. 2024
The North Texas Municipal Water District (NTMWD) operates a sewage lift station that is located inside Turtle Cove at the intersection of Turtle Cove Blvd. and Gullwing Drive. In February NTMWD had two operational incidents related to this station. Both incidents required the immediate dispatch of dozens of large tanker and pump trucks in order to prevent raw sewage from flowing into our streets. We are thankful that NTMWD took action to keep this matter from becoming a large-scale health hazard. However, a side effect of having these large tankers rumbling through the neighborhood is that they did some very obvious damage to our roads, and, we suspect there is some additional damage that has yet to be identified.
POOL LEAK - March 2024
We have a leak in the pool. This is not the first time. The BOD is working with the pool maintenance company and a specialty contractor to determine the location of the leak and schedule a repair ahead of the upcoming season. (Leak located and a mid-grade fix was implemented. More permanent structural repairs are likely necessary after the 2024 pool season)
Water Line Break At Main Gate - Feb. 2024
In February the City of Rockwall had a large water line break at the exit side of our gate. That line has since been repaired. During the repairs the Internet service to our gate was cut and our irrigation lines were damaged. The BOD has worked directly with AT&T and our new landscape vendor CF, to get these utilities repaired.
Every year our volunteer engineering committee conducts a thorough survey of all concrete surfaces within Turtle Cove. The committee writes a report of its findings along with a recommendation for repairs.
POOL LEAK - March 2024
We have a leak in the pool. This is not the first time. The BOD is working with the pool maintenance company and a specialty contractor to determine the location of the leak and schedule a repair ahead of the upcoming season. (Leak located and a mid-grade fix was implemented. More permanent structural repairs are likely necessary after the 2024 pool season)
During the spring and summer our landscape vendor (Fertile Foliage) mows the grass on every Wednesday.
1. 915 Lexington Drive (Island with trees) - Install landscaping (Completed)
Every year our volunteer engineering committee conducts a thorough survey of all concrete surfaces within Turtle Cove. The committee writes a report of its findings along with a recommendation for repairs.